Appendix C

Infrastructure Funding Statement

Monitoring year 2022/2023

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

To be published February 2024

Contents

 

Monitoring year 2022/2023.............................................................................................................. 1

1. Definitions................................................................................................................................... 2

2.0Introduction............................................................................................................................... 4

3.0 Section 106 Agreements....................................................................................................... 6

3.6 Selby......................................................................................................................................... 7

3.8 Harrogate................................................................................................................................. 9

3.10 Ryedale................................................................................................................................ 11

3.14 Hambleton........................................................................................................................... 14

3.18 Craven.................................................................................................................................. 16

3.20 Scarborough........................................................................................................................ 17

3.22 Richmondshire.................................................................................................................... 19

4.0 Community Infrastructure Levy (CIL)................................................................................ 21

4.5 Harrogate (CIL)................................................................................................................. 22

4.10Selby (CIL)........................................................................................................................ 24

4.15 Hambleton (CIL)............................................................................................................. 29

4.20 Ryedale (CIL).................................................................................................................. 37

5.0 CIL Spending......................................................................................................................... 41

6.0Former North Yorkshire County Council Reporting......................................................... 42

 

           

 


 

1. Definitions

 

Agreed – contributions that have been agreed within a signed legal agreement but have not yet been collected/delivered because the appropriate trigger point for payment has not yet been reached. If the planning application is not implemented, these will not be received.

Allocated – contributions that have been received and assigned to specific projects.

Bonds – financial securities which will need to be paid at certain trigger points during the development; either held or repaid to the developers.

Community Infrastructure Levy (CIL) - applies a charge on new developments to help pay for infrastructure (to be noted this only applies to some parishes within the North Yorkshire curtilage).

Infrastructure – Infrastructure is a broad definition covering the different structures, operations, services, facilities, and space that we use to conduct our lives and those of our families. It primarily encompasses the following areas:

(i)            Affordable housing – as defined in the National Planning Policy Framework: housing for sale or rent for those whose needs are not met by the open market.

(ii)          Education: nursery and early years/Primary/Secondary/Post-16/SEN.

(iii)         Highways (Roads, cycleways, and paths).

(iv)         Transport and travel (rail and bus infrastructure).

(v)          Open space and leisure (including sports facilities): All open space of public value, including not just land, but also areas of water (such as rivers, canals, lakes, and reservoirs) which offer important opportunities for sport and recreation and can act as a visual amenity.

(vi)         Community facilities (such as village halls)

(vii)        Digital infrastructure (broadband): this includes electronic communications networks, such as next generation mobile technology (such as 5G) and full fibre broadband connections. It also includes radio and electronic communications masts, and the sites for such installations.

(viii)       Green and blue infrastructure and biodiversity resilience such as rivers, streams, and woodland: a network of multifunctional green space, urban and rural, which can deliver a wide range of environmental and quality of life benefits for local communities.

(ix)         Flood and water management (flood mitigation, management, and defence): this includes infrastructure with the purpose of managing the risk of flood and coastal erosion. This can include structural measures to reduce the likelihood and impact of floods, such as hard defences and flood relief works. It can also include soft defences such as green infrastructure (e.g. natural flood management and sustainable drainage systems).

(x)          Economic development – supporting expansion of resilience to business in the locality.

(xi)         Health (GP/Acute/Mental Health/Primary Care).

 

Land – this includes land which is provided instead of money.

Received – contributions received, either monetary or non-monetary, that have been transferred to North Yorkshire Council (NYC).

Section 106 – A land charge regulation within the planning act which covers aspects that planning conditions cannot.

Spent/Delivered – monetary or non-monetary contributions that have been used as intended, either by spending the allocated funds or completing the contribution as agreed.

CIL regulation definitions:

·         59A - places a duty on charging authorities to pass some Levy funds to local councils where some or all of the chargeable development takes place in an area for which there is a parish or community council. It sets out the proportion of the CIL raised in relation to a development that it applies to. E.g.) 15% neighbourhood.

·         59B – Sets out how the duty in reg 59A applies where the charging authority accepts a land payment.

·         Regulation 59E - The charging authority is able to recover funds from the local council in certain circumstances. That is if the local council has not applied the CIL to support the development of its area within 5 years of receipt or has applied the Levy otherwise than in accordance with regulation 59C. When Levy receipts are recovered from a local council, the charging authority must use those funds to support development in the area of that local council.

·         Regulation 59F - Makes provision for where the duty in regulation 59A does not apply, namely where a chargeable development (or part of a development) takes place in an area for which there is not a parish or community council. In that case, the charging authority has wider spending powers in relation to those parts of its area for which there is not a parish or community council. Those powers are the same as those given to parish or community councils and apply to those funds that would have been passed on had the development taken place in an area for which there is a parish or community council.

2.0   Introduction

 

2.1       This is the North Yorkshire Council Infrastructure Funding Statement (IFS). Local authorities that receive contributions from developers must produce an IFS annually as required by the Community Infrastructure Levy (amendment)(England) Regulation 2019; this came into force 1 September 2019.

2.2      North Yorkshire Council came into being on 1 April 2023 replacing North Yorkshire County Council, Selby District Council, Harrogate District Council, Richmondshire District Council, Hambleton District Council, Craven District Council, Scarborough Borough Council and Ryedale District Council.

2.3       This statement sets out the position for these areas for the financial year immediately prior to the establishment of North Yorkshire Council (NYC) (outside the National Parks). The IFS summaries the amount of developer contributions obtained, allocated and spent in the previous financial year (1 April 2022 – 31 March 2023). The report covers both Section 106 agreements (S.106) commuted sums and Community Infrastructure Levy (CIL) where it is in place.  

2.4      The report aims to offer local communities and developers' clarity and transparency on contributions received and how these have been or are intended to be used.

Headline Figures from 2022/23

To summaries below are some key headline figures which cover the whole geographical area of the new North Yorkshire Council.

CIL is currently collected in the former district areas of Harrogate, Selby, Hambleton and Ryedale.

In 2022/23 the former districts that now make up North Yorkshire Council:

·         Delivered 614 affordable homes across North Yorkshire.

·         Received £6,324,805.85 of S.106 contributions from new development.

·         Received £2,649,580.48 in CIL.

·         Distributed £475,586.15 of CIL (the local allocation) to town and parish councils.

·         Spent £8,203,084.49 of S.106 funds on infrastructure to mitigate development impacts and £2,324,164.51 of CIL on infrastructure to support development of the area.

 

 

2.5      This is the first Infrastructure Funding Statement to be produced by North Yorkshire Council since it came into being 1 April 2023. In this early stage of the new council this report will include entries from each of the former district areas.

 2.6      In summary, this statement will be set out as follows:

Each former district area will set out data and information relating to Section 106 planning obligations receipts for the previous financial year.

It will then go onto report on CIL receipts for the previous financial year, where applicable.

Both sections will include reporting on specific infrastructure projects either delivered or planned, from the monitoring year 2022/23.

The report will then set out the infrastructure position for the former North Yorkshire County Council.

 


 

3.0   Section 106 Agreements

 

3.1       Section 106 of the Town and Country Planning Act 1990 enables a local planning authority (LPAs) to enter into a negotiated agreement – a planning obligation – to mitigate the impact of a specific development and make it acceptable in planning terms. The planning obligations take the form of a Section 106 (S.106) agreement between a developer/landowner, the council, and possibly other parties, or alternatively a unilateral undertaking providing a legal commitment by the developer alone.

3.2      Planning obligations are legal agreements that can be attached to a planning permission to mitigate the impact of development. For example, new residential development can place additional pressure on existing social, physical, and economic infrastructure in the surrounding area. Planning obligations aim to balance extra pressure with improvements to the surrounding area, to ensure that development makes a positive contribution.

3.3      Planning obligations could be sought for the provision or contribution to a new or improved road, school, health facility or local green infrastructure. Local planning authorities can also seek planning obligations to secure a proportion of affordable housing from residential developments.

3.4      Regulations state that a planning obligation may only constitute a reason for granting planning permission for the development if the obligation is:

(i)            necessary to make the development acceptable in planning terms;

(ii)          directly related to the development;

(iii)         and fairly and reasonably related in scale and kind to the development.

 

3.5      The statement will now present the S.106 position for the monitoring year for each former area, using a summarised and more detailed table.

 


 

3.6   Selby

 

3.7      The following table sets out the position for the former Selby area in relation to S.106 planning obligations in line with the requirements of the CIL Regulation (2019 Amendment) 121A Schedule 2 Section 3:

Regulation requirement

Amount

(a)the total amount of money to be provided under any planning obligations which were entered into during the reported year;

£10,850.00

(b)the total amount of money under any planning obligations which was received during the reported year;

£326,340.71

(c)the total amount of money under any planning obligations which was received before the reported year which has not been allocated by the authority;

£0

(d)summary details of any non-monetary contributions to be provided under planning obligations which were entered into during the reported year, including details of—

 

(i)in relation to affordable housing, the total number of units which will be provided;

 

(ii)in relation to educational facilities, the number of school places for pupils which will be provided, and the category of school at which they will be provided;

 

(i)    None

 

 

 

(ii)  NYC Education to provide

(e)the total amount of money (received under any planning obligations) which was allocated but not spent during the reported year for funding infrastructure;

£95,279

(f)the total amount of money (received under any planning obligations) which was spent by the authority (including transferring it to another person to spend);

 

£2,731,598.39

(g)in relation to money (received under planning obligations) which was allocated by the authority but not spent during the reported year, summary details of the items of infrastructure on which the money has been allocated, and the amount of money allocated to each item;

• £93,329 – Allocated to Recreational Open Space Projects in the former Selby area

 

• £1,950 allocated to Waste Services within the former Selby Area

(h)in relation to money (received under planning obligations) which was spent by the authority during the reported year (including transferring it to another person to spend), summary details of—

(i)the items of infrastructure on which that money (received under planning obligations) was spent, and the amount spent on each item;

(ii)the amount of money (received under planning obligations) spent on repaying money borrowed, including any interest, with details of the items of infrastructure which that money was used to provide (wholly or in part);

(iii)the amount of money (received under planning obligations) spent in respect of monitoring (including reporting under regulation 121A) in relation to the delivery of planning obligations;

(i)

•Affordable housing   £2,470173.23

 

•Recreational Open Space £30,363.45 Spent across Cliffe, Barlby and Osgodby, Drax, Tadcaster and Thorpe Willoughby including

·         village green extensions,

·         play equipment

·         outdoor gym,

·         woodland walk

·         Picnic areas 

·         cycle racks.

 

• Education £223,136.71 passed to NYC CYPS

Including money to be spent at or within the locality of:

·         Selby Abbey Primary £92,339.25

·         Hambleton CE £46,906.20

·         Selby High £83,891.26

 

•£7925 passed to waste and recycling services within the former Selby area

 

(ii) £0

 

 

(iii)£0

 

(i)the total amount of money (received under any planning obligations) during any year which was retained at the end of the reported year, and where any of the retained money has been allocated for the purposes of longer-term maintenance (“commuted sums”), also identify separately the total amount of commuted sums held.

 

£0


3.8   Harrogate

 

3.9      The below summary table sets out the general Section 106 position for the former Harrogate area for the monitoring year 2022/23.

Regulation requirement

Amount

(a) the total amount of money to be provided under any planning obligations which were entered into during the reported year;

£919,914.43

(b) the total amount of money under any planning obligations which was received during the reported year;

£2,855,327.91

(c)the total amount of money under any planning obligations which was received before the reported year which has not been allocated by the authority;

£3,621,381.46

 

(d) summary details of any non-monetary contributions to be provided under planning obligations which were entered into during the reported year, including details of—

(i) in relation to affordable housing, the total number of units which will be provided;

(ii) in relation to educational facilities, the number of school places for pupils which will be provided, and the category of school at which they will be provided;

 

 

(i) 287

 

(ii) To be provided by NYC

(e) the total amount of money (received under any planning obligations) which was allocated but not spent during the reported year for funding infrastructure;

£1,415,525.06

(f) the total amount of money (received under any planning obligations) which was spent by the authority (including transferring it to another person to spend);

£307,846.87

 

(g) in relation to money (received under planning obligations) which was allocated by the authority but not spent during the reported year, summary details of the items of infrastructure on which the money has been allocated, and the amount of money allocated to each item;

·      Affordable housing projects £988,680.74

·      Public open space projects in the associated parishes £363,424.52

·      Air Quality management projects £63,419.80 

(h) in relation to money (received under planning obligations) which was spent by the authority during the reported year (including transferring it to another person to spend), summary details of—

 

 

(i) the items of infrastructure on which that money (received under planning obligations) was spent, and the amount spent on each item;

 

 

 

(ii) the amount of money (received under planning obligations) spent on repaying money borrowed, including any interest, with details of the items of infrastructure which that money was used to provide (wholly or in part);

 

 

(iii) the amount of money (received under planning obligations) spent in respect of monitoring (including reporting under regulation 121A) in relation to the delivery of planning obligations;

(i)

·   Health Care - GP practices in Knaresborough £37,968.50

 

·   Parks, Open Space Sports and Leisure £269,878.37 Including

o   Parks and Gardens - £10,522.35

o   Children’s play £6,581.69

o   Village Hall enhancements £180,209.63

o   Allotment enhancements  £1,586.74

o   Churchyards cemetery - £34,889.78

o   Outdoor Sport £10,351.34

o   Open Space and parks - £24,283.40

 

· S106 refund - £1,453.07

 

(ii) £0.00

 

 

(iii) £14,658.00

(i) the total amount of money (received under any planning obligations) during any year which was retained at the end of the reported year, and where any of the retained money has been allocated for the purposes of longer-term maintenance (“commuted sums”), also identify separately the total amount of commuted sums held.

£0

 

 

 


 

3.10 Ryedale

 

3.11    The below table sets out the Section 106 position for the former Ryedale area for the monitoring year 2022/23.

Regulation requirement

Amount

(a) the total amount of money to be provided under any planning obligations which were entered into during the reported year;

£0

(b) the total amount of money under any planning obligations which was received during the reported year;

£1,757,985.00

(c) the total amount of money under any planning obligations which was received before the reported year which has not been allocated by the authority;

£1,094,215.76

(d) summary details of any non-monetary contributions to be provided under planning obligations which were entered into during the reported year, including details of—

(i) in relation to affordable housing, the total number of units which will be provided;

(ii) in relation to educational facilities, the number of school places for pupils which will be provided, and the category of school at which they will be provided;

 

(i) A total of 73 affordable housing completions. The affordable housing units were delivered on the following schemes;

•Whitby Road, Pickering – 21 units;

•Westfield, Kirkbymoorside – 30 units;

•Outgang Road, Pickering – 20 units.

(ii) None

(e) the total amount of money (received under any planning obligations) which was allocated but not spent during the reported year for funding infrastructure;

£1,049,893.39

(f) the total amount of money (received under any planning obligations) which was spent by the authority (including transferring it to another person to spend);

£2,081,252.33

(g) in relation to money (received under planning obligations) which was allocated by the authority but not spent during the reported year, summary details of the items of infrastructure on which the money has been allocated, and the amount of money allocated to each item;

Sports and leisure:

·         £170,000 - Malton Sports Centre for a sports hall project

 

Education commuted sums:

·         £132,561 – Westgate Old Malton to contribute to St Mary's Primary School Malton (Expansion)

·         £54,132.00 also Westgate Old Malton – Malton School new block

·         £227,733.00 - Broughton Road St Mary's Primary School Malton (Expansion)

·         £190,344.00 - Rainbow Lane – St Marys Primary School Malton (Expansion)

·         £72,728.00 - Rainbow Lane – Malton School new block

 

Affordable housing:

·         £98,645.39 - 5 Vine Street, Norton

·         £103,750.00 - Black Swan Yard Helmsley

(h) in relation to money (received under planning obligations) which was spent by the authority during the reported year (including transferring it to another person to spend), summary details of—

(i)the items of infrastructure on which that money (received under planning obligations) was spent, and the amount spent on each item;

(ii)the amount of money (received under planning obligations) spent on repaying money borrowed, including any interest, with details of the items of infrastructure which that money was used to provide (wholly or in part);

(iii)the amount of money (received under planning obligations) spent in respect of monitoring (including reporting under regulation 121A) in relation to the delivery of planning obligations;

(i) Education commuted sums:

·         £832,938.00 – St Mary’s Primary School (Malton) expansion (£591,426) and Malton School new block (£241,512)

·         £119,680.00 – St Mary’s Primary School (Malton) expansion

·         £610,985.00 – Kirkbymoorside Community Primary School, project not yet completed

 

Affordable housing:

·         £79,755.08 - Railway Tavern Norton

·         £119,074.15 - 82 Castlegate,

·         £5,571.25 - 5 Vine Street, Norton

·         £5,650.35 - Black Swan Yard, Helmsley

·         £250,000 – Outgang Lane, Pickering

·         £35,455.00 - RHE and NY Strategy Mng

 

Public Open Space Improvements:

·         £22143.50 – including Leavening gardens and allotments 

 

(ii) N/A

 

(iii) N/A

(I) the total amount of money (received under any planning obligations) during any year which was retained at the end of the reported year, and where any of the retained money has been allocated for the purposes of longer-term maintenance (“commuted sums”), also identify separately the total amount of commuted sums held.

 £0

           

 

 

3.14 Hambleton

 

3.15    The below table sets out the Section 106 position for the former Hambleton area for the monitoring year 2022/23.

Regulation requirement

Amount

(a) the total amount of money to be provided under any planning obligations which were entered into during the reported year;

Blind Lane Aiskew – 20/02882/OUT (April 2022) Open Space Contribution £16,963

Former Shipton Service Station – 21/02619/FUL (Nov 2022) Open Space Contribution £2,592.21

Northallerton Road Leaming Bar – 21/02282/FUL (Aug 2022) Off Site Young Persons Facilities Contribution £21,010.84. There is also a Travel Plan Monitoring Fee of £5,000 payable on First Occupation.

Total: £45,566.05

b) the total amount of money under any planning obligations which was received during the reported year;

£21,097.23

(c)the total amount of money under any planning obligations which was received before the reported year which has not been allocated by the authority;

£1,550,243.32

(d) summary details of any non-monetary contributions to be provided under planning obligations which were entered into during the reported year, including details of—

(i) in relation to affordable housing, the total number of units which will be provided;

 

 

 

(ii) in relation to educational facilities, the number of school places for pupils which will be provided, and the category of school at which they will be provided;

(i)North of Stillington Road, Easingwold 18

North and west of Woodlands Walk, Tanton Road Stokesley 9

Stations Yar, West Tanfield 1

90 Bedale Road Aiskew 17

North of Crakehall Water Mill, Little Crakehall 5

Land to west of Cedar Road and Oak Drive Sowerby, Thirsk 54

Land Off Danes Crest Brompton 21

Total 125 affordable units.

 

(ii) 0

(e) the total amount of money (received under any planning obligations) which was allocated but not spent during the reported year for funding infrastructure;

£60,235.83

(£47,735.83 for Housing Development Officer, £12,500 for Leven Improvement Project)

(f) the total amount of money (received under any planning obligations) which was spent by the authority (including transferring it to another person to spend);

£849,685.81

(g) in relation to money (received under planning obligations) which was allocated by the authority but not spent during the reported year, summary details of the items of infrastructure on which the money has been allocated, and the amount of money allocated to each item;

·         Affordable Housing - £47,735.83 for Housing Development Officer

·         Open Space, Sports and Leisure - £12,500 for Leven Improvement Project

(h) in relation to money (received under planning obligations) which was spent by the authority during the reported year (including transferring it to another person to spend), summary details of—

(i) the items of infrastructure on which that money (received under planning obligations) was spent, and the amount spent on each item;

(ii) the amount of money (received under planning obligations) spent on repaying money borrowed, including any interest, with details of the items of infrastructure which that money was used to provide (wholly or in part);

(iii) the amount of money (received under planning obligations) spent in respect of monitoring (including reporting under regulation 121A) in relation to the delivery of planning obligations;

 

(i)

·         Affordable Housing £367,763

·         Search fees £45.00

·         Open Space, Sports and leisure £481,877.81 (including £389.21 on maintenance

 

(ii) N/A

 

(iii) N/A

(i) the total amount of money (received under any planning obligations) during any year which was retained at the end of the reported year, and where any of the retained money has been allocated for the purposes of longer-term maintenance (“commuted sums”), also identify separately the total amount of commuted sums held.

£12,224.36

 

           

 

 

 

 

 

 

 

3.18 Craven

 

3.19    The below table sets out the Section 106 position for the former Craven area for the monitoring year 2022/23.   

Regulation requirement

Amount

(a) the total amount of money to be provided under any planning obligations which were entered into during the reported year;

£0

(b) the total amount of money under any planning obligations which was received during the reported year;

£707,083

(c)the total amount of money under any planning obligations which was received before the reported year which has not been allocated by the authority;

£778,985

(d) summary details of any non-monetary contributions to be provided under planning obligations which were entered into during the reported year, including details of—

(i) in relation to affordable housing, the total number of units which will be provided;

(ii) in relation to educational facilities, the number of school places for pupils which will be provided, and the category of school at which they will be provided;

 

(i)            0 Units

 

(ii)          NYC Education to provide

(e) the total amount of money (received under any planning obligations) which was allocated but not spent during the reported year for funding infrastructure;

£745,349.19

 

(f) the total amount of money (received under any planning obligations) which was spent by the authority (including transferring it to another person to spend);

£368,172.26

(g) in relation to money (received under planning obligations) which was allocated by the authority but not spent during the reported year, summary details of the items of infrastructure on which the money has been allocated, and the amount of money allocated to each item;

·   Children's Equipped Play £43,275.04

·   Youth Provision & Informal Play £42,705.66

·   Adult Provision, recreation & playing fields £638,289.49

·   Allotment and Civic & Amenity Space £ 21,079.00

 

(h) in relation to money (received under planning obligations) which was spent by the authority during the reported year (including transferring it to another person to spend), summary details of—

 

(i) the items of infrastructure on which that money (received under planning obligations) was spent, and the amount spent on each item;

 

 

 

(ii) the amount of money (received under planning obligations) spent on repaying money borrowed, including any interest, with details of the items of infrastructure which that money was used to provide (wholly or in part);

 

(iii) the amount of money (received under planning obligations) spent in respect of monitoring (including reporting under regulation 121A) in relation to the delivery of planning obligations;

(i)             

·      £91,478 Affordable Housing
£276,694.26 Public Open Space including:

·      Children's Equipped Play £99,758.67

·      Youth Provision & Informal Play £109,610.00

·      Adult Provision, recreation & playing fields   £53,360.79

·      Allotment and Civic & Amenity Space £13,964.80

 

(ii) £0

 

(iii) £0

(i) the total amount of money (received under any planning obligations) during any year which was retained at the end of the reported year, and where any of the retained money has been allocated for the purposes of longer-term maintenance (“commuted sums”), also identify separately the total amount of commuted sums held.

 

£0

 

 


3.20 Scarborough

 

3.21    The below table sets out the Section 106 position for the former Scarborough area for the monitoring year 2022/23.

Regulation requirement

Amount

(a) the total amount of money to be provided under any planning obligations which were entered into during the reported year;

£581,258

(b) the total amount of money under any planning obligations which was received during the reported year;

£533,500

(c)the total amount of money under any planning obligations which was received before the reported year which has not been allocated by the authority;

£2,820,210

(d) summary details of any non-monetary contributions to be provided under planning obligations which were entered into during the reported year, including details of—

(i) in relation to affordable housing, the total number of units which will be provided;

 

(ii) in relation to educational facilities, the number of school places for pupils which will be provided, and the category of school at which they will be provided;

 

 

 

(i) 129 affordable dwellings

 

(ii) 11.5 primary school places

(e) the total amount of money (received under any planning obligations) which was allocated but not spent during the reported year for funding infrastructure;

£475,508

(f) the total amount of money (received under any planning obligations) which was spent by the authority (including transferring it to another person to spend);

£308,315

(g) in relation to money (received under planning obligations) which was allocated by the authority but not spent during the reported year, summary details of the items of infrastructure on which the money has been allocated, and the amount of money allocated to each item;

·   Homelessness Strategy £380,192

·   Cinder Track, Scarborough £12,414

·   Falsgrave Park, Scarborough £6,996

·   Public Open Space, Oliver’s Heights, Scarborough £5,336

·   Eastside Community Centre, Whitby (Sports) £50,000

·   White Leys Play Area, Whitby £709

·   Scalby-Scarborough bus service subsidy. £19,861

 

(h) in relation to money (received under planning obligations) which was spent by the authority during the reported year (including transferring it to another person to spend), summary details of—

 

(i) the items of infrastructure on which that money (received under planning obligations) was spent, and the amount spent on each item;

 

(ii) the amount of money (received under planning obligations) spent on repaying money borrowed, including any interest, with details of the items of infrastructure which that money was used to provide (wholly or in part);

 

(iii) the amount of money (received under planning obligations) spent in respect of monitoring (including reporting under regulation 121A) in relation to the delivery of planning obligations;

(i)

·   Affordable Housing, Trafalgar Square, Scarborough £90,738

·   Affordable Housing, Sneaton Castle, Whitby £30,000

·   Public Open Space, Oliver’s Heights, Scarborough £11,413

·   Filey Sports Ground Improvements £5,576

·   Scalby-Scarborough bus service subsidy £90,059

·   West Ayton GP Surgery improvements £34,068

 

(ii) £0

 

(iii) £5,696

 

(i) the total amount of money (received under any planning obligations) during any year which was retained at the end of the reported year, and where any of the retained money has been allocated for the purposes of longer-term maintenance (“commuted sums”), also identify separately the total amount of commuted sums held.

 

£32,971

 


 

3.22 Richmondshire

 

3.23    The below table sets out the Section 106 position for the former Richmondshire area for the monitoring year 2022/23.

Regulation requirement

Amount

(a) the total amount of money to be provided under any planning obligations which were entered into during the reported year;

£23,600

(b) the total amount of money under any planning obligations which was received during the reported year;

£47,400

(c)the total amount of money under any planning obligations which was received before the reported year which has not been allocated by the authority;

£515,326

(d) summary details of any non-monetary contributions to be provided under planning obligations which were entered into during the reported year, including details of

(i) in relation to affordable housing, the total number of units which will be provided;

(ii) in relation to educational facilities, the number of school places for pupils which will be provided, and the category of school at which they will be provided;

 

 

(i) 0

 

(ii) N/A

(e) the total amount of money (received under any planning obligations) which was allocated but not spent during the reported year for funding infrastructure;

£0

(f) the total amount of money (received under any planning obligations) which was spent by the authority (including transferring it to another person to spend);

£257,000

(g) in relation to money (received under planning obligations) which was allocated by the authority but not spent during the reported year, summary details of the items of infrastructure on which the money has been allocated, and the amount of money allocated to each item;

£0

(h) in relation to money (received under planning obligations) which was spent by the authority during the reported year (including transferring it to another person to spend), summary details of—

(i) the items of infrastructure on which that money (received under planning obligations) was spent, and the amount spent on each item;

(ii) the amount of money (received under planning obligations) spent on repaying money borrowed, including any interest, with details of the items of infrastructure which that money was used to provide (wholly or in part);

(iii) the amount of money (received under planning obligations) spent in respect of monitoring (including reporting under regulation 121A) in relation to the delivery of planning obligations;

(i)

• Affordable housing projects £257,000 including:

·         £217,000 towards the upper Dales CLT,

·         £20,000 to Middleham Town Council and

·         £20,000 towards Hudswell Community Charity)

(ii) £0

 

(iii) £0

(i) the total amount of money (received under any planning obligations) during any year which was retained at the end of the reported year, and where any of the retained money has been allocated for the purposes of longer-term maintenance (“commuted sums”), also identify separately the total amount of commuted sums held.

£0

 


 

4.0   Community Infrastructure Levy (CIL)

 

4.1      The 2008 Planning Act made provision that most financial contributions could be secured by the Community Infrastructure Levy (CIL). It was the government’s intention at the time that this would become the usual means of securing funding for off-site infrastructure, excluding affordable housing. This general intention has not changed and may be expanded in due course. It would also allow the pooling of contributions (in a manner not previously permitted by s.106 agreements) over a wide geographic coverage (rather than only to the town/parish where the development which generated the funds was sited).

4.2      In contrast to S.106 contributions:

      there does not need to be a direct link between the payment and the infrastructure provided.

      the use of CIL is not specified at the point of collection.

      its calculation is an administrative process rather than a negotiation based on an assessment of development impacts.

      it applies to developments that are often smaller in scale.

      A proportion of the CIL is allocated locally, and to cover its administration.

 

4.3      Prior to the establishment of North Yorkshire Council, CIL was adopted in four of

the former Councils:

·         Selby District Council, adopted CIL in 2016

·         Harrogate District Council, adopted CIL in 2020

·         Hambleton District Council, adopted CIL in 2015

·         Ryedale District Council, adopted CIL in 2016

 

4.4      The charging schedules in place for these former districts will continue for the respective areas as part of North Yorkshire Council. The Craven, Scarborough and Richmondshire areas do not currently have a CIL charging schedule in operation.


 

4.5    Harrogate (CIL)

 

4.6      CIL was adopted by the former Harrogate Borough Council and came into effect on 1 October 2020. The Levy rates are published in the charging schedule:

https://www.northyorks.gov.uk/sites/default/files/2023-03/Community%20infrastructure%20levy%20charging%20schedule%20July%202020%20-%20accessible.pdf

 4.7     The following sets out a summary of the CIL receipts for 2022/23:

Regulation requirement

Amount

(a) The total value of CIL set out in all demand notices issued in the reported year;

£148,467.15

(b) the total amount of CIL receipts for the reported year;

£136,742.15

(c) the total amount of CIL receipts, collected by the authority, or by another person on its behalf, before the reported year but which have not been allocated;

£24,950.69

(d) the total amount of CIL receipts, collected by the authority, or by another person on its behalf, before the reported year and which have been allocated in the reported year;

£4,403.06

(e) the total amount of CIL expenditure for the reported year;

£0

(f) the total amount of CIL receipts, whenever collected, which were allocated but not spent during the reported year;

£0

(g) in relation to CIL expenditure for the reported year, summary details of—

(i) the items of infrastructure on which CIL (including land payments) has been spent, and the amount of CIL spent on each item;

(ii) the amount of CIL spent on repaying money borrowed, including any interest, with details of the items of infrastructure which that money was used to provide (wholly or in part);

(iii) the amount of CIL spent on administrative expenses pursuant to regulation 61, and that amount expressed as a percentage of CIL collected in that year in accordance with that regulation;

 

(i) Refer to the Neighbourhood area apportionment table detailed in 4.8.

 

(ii) N/A

 

 

(iii) £6,837.11

 

(h) In relation to CIL receipts, whenever collected which were allocated but not spent during the reported year. Summary details of the items of infrastructure on which CIL (including land payments) has been allocated, and the amount of CIL allocated to each item;

£0

(i) the amount of CIL passed to—

(i) any parish council under regulation 59A or 59B (definition in Section 1); and

(ii) any person under regulation 59(4);

 

(i) £0

 

(ii) £0

(j) summary details of the receipt and expenditure of CIL to which regulation 59E (CIL recovered from a local Council, further description in Section 1 of Statement) or 59F (CIL development that takes place in an area without a parish or community council, details in Section 1) applied during the reported year including—

(i) the total CIL receipts that regulations 59E and 59F applied to;

(ii) the items of infrastructure to which the CIL receipts to which regulations 59E and 59F applied have been allocated or spent, and the amount of expenditure allocated or spent on each item;

 

 

 

 

(i) £0

 

 

(ii) £0

(k) summary details of any notices served in accordance with regulation 59E, definition including—

(i) the total value of CIL receipts requested from each parish council;

(ii) any funds not yet recovered from each parish council at the end of the reported year;

 

(i) None

 

(ii) None

(l) the total amount of—

(i) CIL receipts for the reported year retained at the end of the reported year other than those to which regulation 59E or 59F applied;

(ii) CIL receipts from previous years retained at the end of the reported year other than those to which regulation 59E or 59F applied;

(iii) CIL receipts for the reported year to which regulation 59E or 59F applied retained at the end of the reported year;

(iv) CIL receipts from previous years to which regulation 59E or 59F applied retained at the end of the reported year

 

(i)    £136,742.15

 

 

(ii)  £24,950.69

 

(iii) £0

 

(iv) £0

 

 

4.8       The below table sets out the portion of CIL distributed to the relevant neighbourhood area within the monitoring year, with information on the associated infrastructure projects:

Town/Parish

Planning Reference

Amount received

Date sent

Spend or anticipated spend

Killinghall

20/04084/FULMAJ

£342.71

26.7.21

Not reported

Laverton

21/02755/FUL

£1670.25

28.2.22

Not reported

Marton cum Grafton

20/03911/FUL

£990.00

30.9.21

Not reported

 

4.9       CIL expenditure

There has been £0 of expenditure in relation to Council held levy. However, a total of £3002.96 has been distributed to the associated Parish and Town Council’s through the 15%/25% proportion per liable scheme, over the monitoring period 1 April 2022 to 31 March 2023.

4.10  Selby (CIL)

 

4.11    CIL was adopted by the former Selby District Council and came into effect January 2016. The Levy rates are published in the charging schedule:

https://www.northyorks.gov.uk/sites/default/files/fileroot/planning_migrated/developer_contributions/CIL_Charging_Schedule_Jan.pdf

4.12    The following table sets out a summary of the CIL receipts for 2022/23:

Regulation requirement

Amount

(A) The total value of CIL set out in all demand notices issued in the reported year;

£568,125.62

(B) the total amount of CIL receipts for the reported year;

£462,563.92

(C) the total amount of CIL receipts, collected by the authority, or by another person on its behalf, before the reported year but which have not been allocated;

£2,871,744.90

(D) the total amount of CIL receipts, collected by the authority, or by another person on its behalf, before the reported year and which have been allocated in the reported year;

£100,542.18

(E) the total amount of CIL expenditure for the reported year;

£750,000.00

(F) the total amount of CIL receipts, whenever collected, which were allocated but not spent during the reported year;

£233,750.00

(G) in relation to CIL expenditure for the reported year, summary details of—

(i) the items of infrastructure on which CIL (including land payments) has been spent, and the amount of CIL spent on each item;

(ii) the amount of CIL spent on repaying money borrowed, including any interest, with details of the items of infrastructure which that money was used to provide (wholly or in part);

(iii) the amount of CIL spent on administrative expenses pursuant to regulation 61, and that amount expressed as a percentage of CIL collected in that year in accordance with that regulation;

 

(i)£750,000.00

 

 

(ii) £0

 

(iii) £40,230

(H) In relation to CIL receipts, whenever collected which were allocated but not spent during the reported year. Summary details of the items of infrastructure on which CIL (including land payments) has been allocated, and the amount of CIL allocated to each item;

£233,750.00

(I) the amount of CIL passed to—

(i) any parish council under regulation 59A or 59B (definition in Section 1 of statement); and

(ii) any person under regulation 59(4);

 

(i) £106,915.17

 

(ii)£0

 

(J) summary details of the receipt and expenditure of CIL to which regulation 59E (CIL recovered from a local Council, further description in Section 1 of Statement) or 59F (CIL development that takes place in an area without a parish or community council, details in Section 1) applied during the reported year including—

(i) the total CIL receipts that regulations 59E and 59F applied to;

(ii) the items of infrastructure to which the CIL receipts to which regulations 59E and 59F applied have been allocated or spent, and the amount of expenditure allocated or spent on each item;

 

(i)£0

 

 

 

(ii) £0

(k) summary details of any notices served in accordance with regulation 59E, definition including—

(i) the total value of CIL receipts requested from each parish council;

(ii) any funds not yet recovered from each parish council at the end of the reported year;

 

(i)            £0

 

(ii)          NA

(l) the total amount of—

(i) CIL receipts for the reported year retained at the end of the reported year other than those to which regulation 59E or 59F applied;

(ii) CIL receipts from previous years retained at the end of the reported year other than those to which regulation 59E or 59F applied;

(iii) CIL receipts for the reported year to which regulation 59E or 59F applied retained at the end of the reported year;

(iv) CIL receipts from previous years to which regulation 59E or 59F applied retained at the end of the reported year

 

(i)            £444,229.45

(ii)          £2,791,744.86

(iii)         £0

(iv)         £0

 

4.13    The below table sets out the portion of CIL distributed to the relevant neighbourhood area within the monitoring year, with information on the associated infrastructure projects:

Town/Parish

Planning Reference

Amount received

Date sent

Spend or anticipated spend

 

Appleton Roebuck

2020/0258/ATD, 2020/0259/ATD,2020/0278/ATD,2020/0279/ATD,2020/0287/ATD

 

£22,529.83

 

21/04/22

 

 

No response received from PC

Barkston Ash

2019/0804/FUL

£387.77

Still held by NYC

No response from PC of accounts

Barlby & Osgoby

2022/0444/FUL

£554.23

 

Nov22

£554.23 spent on environmental improvements

Brotherton

2017/1017/FUL, 2018/0583/FUL, 2018/1332/FUL, & 2020/1033/FUL

£5891.82

16/05/22

No response received from PC

 

Camblesforth

2018/1115/FUL & 2018/1240/FUL

£7961.38

09/05/22

No response received from PC

 

Carlton

2020/0946/REM

£281.99

16/06/22

PC are raising funds for a repair project of the cemetery walls

Cliffe

2016/1457/FUL & 2019/1218/REM

£8108.70

16/06/22

No response received from PC

 

Fairburn

2019/1352/FUL

£7913.70

03/11/22

No response received from PC

Hemingbrough

2019/0217/REM, 2018/1045/FUL & 2019/1329/FUL

£7155.51

21/06/22

No response received from PC

Kellington

2020/0807/FUL & 2019/1328/REMM

£11,148.52

25/04/22 & 31/03/23

No response received from PC

Monk Fryston

2020/0567/FUL

£5127.55

09/05/22

No response received from PC

Newland

2020/1174/ATD

£4540.61

21/06/22

Land clearance of public space and a war memorial plaque

Selby

2020/0776/FULM

£1021.94

June 22

Play equipment, bins and picnic benches for local park

Sherburn

2020/1265/FUL

£2787.92

April 22

No response received from PC

South Milford

2021/0155/S73

£1596.89

21/04/22

No response received from PC

Stillingfleet

2021/0447/S73

£1794.11

15/08/22

Allocated to spend on a village playground project

Stutton

2017/1227/REM

£491.25

21/06/22

Spent on a village war memorial

Thorganby

2018/0226/FUL & 2018/0598/FUL

£3900.10

21/06/22

No response received from PC

Ulleskelf

2019/0325/FULM

£120,118.40

April 22

Allocated to extension and refurbishments of sports pavilion

 

4.14    CIL expenditure

A total of £213,312.22 has been distributed to the associated Parish and Town Council’s through the 15%/25%* proportion per liable scheme, over the monitoring period 1 April 2022 to 31 March 2023. As per section G £750,000 has been spent on a new surgery at Sherburn In Elmet.

 

4.15 Hambleton (CIL)

 

4.16    CIL was adopted by the former Hambleton District Council and came into effect April 2015. The Levy rates are published in the charging schedule:

https://www.northyorks.gov.uk/sites/default/files/fileroot/planning_migrated/developer_contributions/CIL_Full_Charging_Schedule___March_2015.pdf)

4.17    The following sets out a summary of the CIL receipts for 2022/23:

Regulation requirement

Amount

(a) The total value of CIL set out in all demand notices issued in the reported year;

£2,974,423.79 (CIL) + £2,037.70 (Surcharge)

Total = £2,976,461.79

(b) the total amount of CIL receipts for the reported year;

£1,783,744.46 (CIL) + £2,435.00 (Surcharge)

Total =

£1,786,179.46

(c) the total amount of CIL receipts, collected by the authority, or by another person on its behalf, before the reported year but which have not been allocated;

£1,258,398.10

 

(d) the total amount of CIL receipts, collected by the authority, or by another person on its behalf, before the reported year and which have been allocated in the reported year;

Allocated £1,019,793.00 – Projects in 22/23

Allocated £227,639.72 Parish Council contributions

(e) the total amount of CIL expenditure for the reported year;

£1,311,890.61 – projects

£267,561.67 - parish council

£89,187.22 - admin

(f) the total amount of CIL receipts, whenever collected, which were allocated but not spent during the reported year;

£3,298,587.39

 

(g) in relation to CIL expenditure for the reported year, summary details of—

(i) the items of infrastructure on which CIL (including land payments) has been spent, and the amount of CIL spent on each item;

 

(ii) the amount of CIL spent on repaying money borrowed, including any interest, with details of the items of infrastructure which that money was used to provide (wholly or in part);

 

(iii) the amount of CIL spent on administrative expenses pursuant to regulation 61, and that amount expressed as a percentage of CIL collected in that year in accordance with that regulation;

 

(i) Refer to the Neighbourhood area apportionment table below.

 

 

 

(ii) Nothing borrowed in 22/23

 

 

(iii) 89,187.22

As a percentage of total collected 4.993%

(h) In relation to CIL receipts, whenever collected which were allocated but not spent during the reported year. Summary details of the items of infrastructure on which CIL (including land payments) has been allocated, and the amount of CIL allocated to each item;

 

£3,298,587.39

£2,000,000 Northallerton Primary School

£340,000 Bedale 3G Pitch

£776,403.00 Sowerby 3G pitch and changing facilities

£560,442 Northallerton Sports Village

£114,520 Aiskew Community Hall

£161,613 Easingwold Market Place footways and accessibility

£150,000 Huby and Sutton Community Shop

£80,000 Northallerton Town Allotments

£8,000 Northallerton Green Corridors

£103,438 Topcliffe Playpark and allotments

£100,000 Watson Scout Centre

£40,000 Northallerton Town Centre toilets

£45,000 Tollerton play area

£8,208 Thormanby PArish Meeting

£40,000 Thirsk Primary School MUGA

£60,864 Easingwold Community Hub

£22,190 Brafferton and Helperby Cobbles and allotments

(i) the amount of CIL passed to—

(i) any parish council under regulation 59A or 59B (definitions found in Section 1); and

(ii) any person under regulation 59(4);

 

(i) £267,561.67

 

(ii) None

(j) summary details of the receipt and expenditure of CIL to which regulation 59E (CIL recovered from a local Council, further description in Section 1 of Statement) or 59F (CIL development that takes place in an area without a parish or community council, details in Section 1) applied during the reported year including—

(i) the total CIL receipts that regulations 59E and 59F applied to;

(ii) the items of infrastructure to which the CIL receipts to which regulations 59E and 59F applied have been allocated or spent, and the amount of expenditure allocated or spent on each item;

 

 

 

(i) £0

 

(ii) N/A

(k) summary details of any notices served in accordance with regulation 59E, definition including—

(i) the total value of CIL receipts requested from each parish council;

(ii) any funds not yet recovered from each parish council at the end of the reported year;

 

(i) N/A

 

(ii) N/A

 

(l) the total amount of—

(i) CIL receipts for the reported year retained at the end of the reported year other than those to which regulation 59E or 59F applied;

(ii) CIL receipts from previous years retained at the end of the reported year other than those to which regulation 59E or 59F applied;

(iii) CIL receipts for the reported year to which regulation 59E or 59F applied retained at the end of the reported year;

(iv) CIL receipts from previous years to which regulation 59E or 59F applied retained at the end of the reported year

 

 

(i)    £104,250.26

 

(ii)  £5,235,362.38

 

(iii) N/A

 

(iv) N/A

 

4.18    The table overleaf sets out the portion of CIL distributed to the relevant neighbourhood area within the monitoring year, with information on the associated infrastructure projects:

Town/Parish

Planning Reference

Amount received

Date sent

Spend or anticipated spend

Ainderby Steeple

20/01007/FUL

£1,032.90

October 2022

The money contributed towards the cost of investigating and repairing the drainage system and resurfacing of an unadopted lane leading down to the railway line from the edge of the village green, which had badly deteriorated and was causing problems for the residents who live there.

The total cost of the roadworks was £5,550.36.

Aiskew

20/01889/REM

20/00497/FUL

20/00497/FUL

20/01084/FUL

21/00220/REM

21/01343/FUL

£969.30

£14,637.07

£12,648.11

£1,633.50

£27,501.04

£734.44

April 2022

April 2022

October 2022

October 2022

October 2022

October 2022

The total £58,123.46 sent to the parish within this monitoring year contributes to a larger pot totalling £144,000. The Councillors have decided to spend approximately £64,000 of this CIL money so far, on the following projects:

I. Community Hall (Feasibility Study)

II. Kingfisher Toddler Play Area

III. Kingfisher Swings

IV. Mattison replacing artificial grass area.

V. Freemans Way Basketball Boards

VI. Leeming Bar Play area fencing

VII. Christmas trees area for Aiskew

VIII. Christmas Lighting for Aiskew and Leeming Bar

IX. Ascough Wynd Play Area Revamp / enlarge.

X. Orchard on Freemans Way Park

XI. Wensleydale Railway

Alne

21/00415/MRC

21/00584/REM

21/00584/REM

22/00071/FUL

£3112.31

£862.13

£862.13

£1619.77

April 2022

April 2022

October 2022

October 2022

The Parish Council are looking to make a £9,000 grant to APLA the villages recreation organisation for new equipment but this has yet to be agreed and is likely to be agreed at the October meeting.

Bagby

18/00124/REM

£1,641.75

April 2022

The parish council have put this money towards setting up allotments for residents in Bagby.

Birkby

17/01899/FUL

£247.50

April 2022

Project yet to be agreed.

Brafferton and Helperby

20/01429/MBN

£160.13

April 2022

CIL holdings have been used to partly cover the cost of works to cobbles in Main Street, Helperby this year.

Burneston

20/02702/MRC

£1567.50

April 2022

The CIL Money received went towards the cost of buying a Visual Display Unit for Burneston to help control the speeding traffic through the village.  The amount received together with a grant from NYCC covered the cost.

Burrill with Cowling

19/00052/FUL

 

 

22/00737/MRC

£2,928.75

 

£2,366.01

October 2022

 

October 2022

The Parish is looking into the purchase and installation of a defibrillator. At this stage I would estimate the expenditure to be £2200. No decision has been made yet on the remaining funds.

Carlton Miniott

20/02429/REM

£1,982.06

October 2022

Part of the CIL money received has been used to purchase a defibrillator and install it.  The Council is also organising training on the use of the defibrillator.

Carthorpe

21/02119/REM

£2,871.00

October 2022

The CIL money was used to purchase a refurbished Old Red Telephone Box which has been installed in the village and is being used as a community swap shop. The cost of the phone box was £3684.00.

Crakehall

20/00330/FUL

 

20/00330/FUL

£2,853.10

 

£8,559.29

April 2022

 

October 2022

Project(s) yet to be agreed, but the two main areas of consideration are:

Refurbishment of the old chapel in Crakehall cemetery. Some initial repainting has been done and a small amount of CIL money was spent on this. The chapel requires some replacement stonework to rehang the bell and then a complete repaint inside, enquiries are ongoing to source a stonemason and we have volunteers for repainting.

Replacement of ageing and broken play equipment. Recent inspections have revealed a need to replace certain items with a capital cost estimated at some £25000. The intention is to apply for a lottery grant after the rules change in November and depending upon the outcome of that, some CIL monies may be used to supplement any award.

Updates on spend will be published in the next IFS.

Dalton

19/00099/FUL

 

20/00054/FUL

£8,580.00

 

£783.75

April 2022

 

October 2022

No response received  

Easingwold

18/02681/FUL

 

21/00140/MRC

 

19/00085/FUL

 

19/00085/FUL

 

20/02538/FUL

 

21/00040/REM

£7,462.1

 

£891.00

 

£1,274.63

£1,274.63

 

£27,220.50

£994.13

April 2022

April 2022

April 2022

October 2022

October 2022

October 2022

All CIL monies received by the Town Council contributed to a major paths project carried out in Easingwold over summer 2023.

 

East Harlsey

19/01306/FUL

 

21/02236/MRC

£1,012.40

£880.15

April 2022

October 2022

The parish have spent £3947.10 so far in CIL spending. This includes the money received in this monitoring years, and previous years.

Croft Castings – July 2023           £2490.80

Village hall benches – Feb 2023  £1077.30

Church Bench – March 2023     £379

Exelby, Leeming and Londonderry

20/02906/MRC

£6,230.81

April 2022

No response received

Felixkirk

18/01398/FUL

£247.50

April 2022

No response received

Great and Little Broughton

20/02641/FUL

£730.13

April 2022

No response received

Hackforth

20/02821/REM

 

20/02821/REM

£416.63

 

£1,249.88

April 2022

October 2022

Project(s) yet to be agreed.

Hornby

21/02080/FUL

£820.24

October 2022

The Parish have not yet formally decided on a project. There is a possibility the money will used for a children’s play area, but a location needs to be identified.

Huby

21/01846/REM

20/02777/MRC

£536.25

 

£1,493.25

October 2022

October 2022

No response received

Husthwaite

19/01139/FUL

 

 

 

 

 

 

 

 

21/01960/FUL

£1,831.50

 

 

 

 

 

 

 

 

£4,306.50

April 2022

 

 

 

 

 

 

 

October 2022

£600.00 towards the erection of a 1.8m high green fence between the recreation area and the primary school to enhance safeguarding and deter trespassers to school property. (total coats of project £3935)

£1231.50 went towards the repair and replacement of equipment in Husthwaite recreation area including the basket swing and repairs to adventure trail (the total cost of the project £3785).

£1291 for the repair of the monkey bars in the Husthwaite recreation area

£3015.50 still to be allocated.

Hutton Rudby

16/01836/FUL

£12,820.50

October 2022

The Parish is in the process of designing and seeking tenders for the building of steps to go across the village green to enable residents to safely cross from Church House.  This will incorporate handrails and a platform halfway down to improve accessibility. There is an alternative route already in place which is wheelchair accessible. The Parish intend that the CIL money will be put towards this project.

Kirkby

20/00859/REM

£2,887.50

April 2022

No response received

Newton on Ouse

20/00672/FUL

£6,072.00

April 2022

The PC agreed at its meeting on 12th September 2023 to allocate £3.000 to Newton on Ouse Community Association as a donation towards new playground equipment that they are fundraising for. They need £80,000 in total.

Northallerton

21/01712/REM

 

18/02646/REM

£1,990.31

 

£1,056.00

October 2022

These CIL funds have been used towards to provision of new public toilets in Northallerton, the total project cost of which is approximately £130,000.

Raskelf

21/02067/MRC

21/02067/MRC

 

19/02357/FUL

 

20/02529/FUL

£1,257.63

£3,772.89

 

£391.46

 

£1,911.94

April 2022

October 2022

October 2022

October 2022

No response received

Sandhutton

18/02370/FUL

£396.00

April 2022

The monies were used towards the purchase of two benches for the village green for residents to enjoy (both needed replacement due to concrete cancer)

The total Cost £1188.

Shipton

19/02044/FUL

 

 

20/00933/FUL

£3,314.84

 

 

£1,839.75

 

April 2022

 

April 2022

£2445 was used in June for an emergency repair to the zip line.

The remaining CIL money has been earmarked for playground expenditure, there is a large piece of wooden equipment that needs replacing. However, the project will cost approximately £20,000, further fundraising is required before they can proceed.

South Otterington

21/00718/REM

£5,860.86

April 2022

A total of £4,176.00 was spent in April 2022 on 4 notice boards for villages with jubilee platinum plaques. This project came from past CIL money. The money received in this monitoring year has no agreed project spend at the stage.

Sutton on the Forest

20/01740/FUL

 

21/01683/REM

 

 

18/00916/FUL

 

£1,196.25

 

£2,054.25

 

 

£1,641.75

 

April 2022

 

April 2022

 

 

October 2022

 

The parish have spent CIL money on the following projects to date:

Tables for use at village events                            £588.00

Dog bins for the village                             £853.20

The balance of £3,451.05 is in our reserve account ringfenced for future use.

 

Stillington

22/00959/FUL

£312.57

October 2022

No response received

Thirsk

21/01200/MRC

£7,984.38

April 2022

No response received

Thormanby

21/01702/MRC

 

21/01515/FUL

£4,537.50

 

£808.50

April 2022

October 2022

No response received

Tollerton

22/00462/FUL

£248.40

October 2022

No response received

Well

21/00978/REM

£3,712.50

December 2022 

No spend has been agreed for the money received in December 2022 yet.

Money received in previous years was spent as follows:

£1,831.50 received April 2021 went towards payment to streetscape for new young adult equipment, jubilee Beacon and a speed activation sign pole

£1831.50 received in November 2021 went towards speed activation sign poles.

West Tanfield

22/00998/REM

£2,546.10

October 2022

Project(s) yet to be agreed.

 

4.19    CIL expenditure

There has been £1,311,890.61 of expenditure in relation to District Council held levy. A total of £227,639.72 has been distributed to the associated Parish and Town Council’s through the 15%/20%* proportion per liable scheme, over the monitoring period 1 April 2022 to 31 March 2023.

 

 

4.20 Ryedale (CIL)

 

4.21    CIL was adopted by the former Ryedale District Council and commenced on 1st March 2016. The Levy rates are published in the charging schedule:

https://www.northyorks.gov.uk/sites/default/files/fileroot/planning_migrated/planning_policy/Ryedale_CIL_Charging_Schedule.pdf

4.22    The following table sets out a summary of the CIL receipts for 2022/23:

Regulation requirement

Amount

(a) The total value of CIL set out in all demand notices issued in the reported year;

£162,869.15

(b) the total amount of CIL receipts for the reported year;

£264,094.95

(c) the total amount of CIL receipts, collected by the authority, or by another person on its behalf, before the reported year but which have not been allocated;

£3,037,909.10

(d) the total amount of CIL receipts, collected by the authority, or by another person on its behalf, before the reported year and which have been allocated in the reported year;

£523,899.91 in parish apportionment

(e) the total amount of CIL expenditure for the reported year;

£34,634.21 in parish apportionment

(f) the total amount of CIL receipts, whenever collected, which were allocated but not spent during the reported year;

£6,209.15 in parish apportionment not paid with the monitoring year. No other allocated CIL receipts were unspent.

(g) in relation to CIL expenditure for the reported year, summary details of—

(i) the items of infrastructure on which CIL (including land payments) has been spent, and the amount of CIL spent on each item;

 

(ii) the amount of CIL spent on repaying money borrowed, including any interest, with details of the items of infrastructure which that money was used to provide (wholly or in part);

 

(iii) the amount of CIL spent on administrative expenses pursuant to regulation 61, and that amount expressed as a percentage of CIL collected in that year in accordance with that regulation;

G

(i) Refer to the Neighbourhood area apportionment table below.

 

(ii) N/A

 

 

(iii) £0

(h) In relation to CIL receipts, whenever collected which were allocated but not spent during the reported year. Summary details of the items of infrastructure on which CIL (including land payments) has been allocated, and the amount of CIL allocated to each item;

None

(i) the amount of CIL passed to—

 

(i) any parish council under regulation 59A or 59B (parish and land payments); and

 

(ii) any person under regulation 59(4);

i

(i) £558,534.12 Since CIL was introduced, £34,634,21 this monitoring year (22/23).

 

(ii) N/A

(j) summary details of the receipt and expenditure of CIL to which regulation 59E (CIL recovered from a local Council, further description in Section 1 of Statement) or 59F (CIL development that takes place in an area without a parish or community council, details in Section 1) applied during the reported year including—

(i) the total CIL receipts that regulations 59E and 59F applied to;

(ii) the items of infrastructure to which the CIL receipts to which regulations 59E and 59F applied have been allocated or spent, and the amount of expenditure allocated or spent on each item;

j

 

 

 

(i) £0

 

(ii) £0

(k) summary details of any notices served in accordance with regulation 59E, including—

(i) the total value of CIL receipts requested from each parish council;

(ii) any funds not yet recovered from each parish council at the end of the reported year;

k

(i) £0

 

 

(ii) £0

(l) the total amount of—

(i) CIL receipts for the reported year retained at the end of the reported year other than those to which regulation 59E or 59F applied;

(ii) CIL receipts from previous years retained at the end of the reported year other than those to which regulation 59E or 59F applied;

(iii) CIL receipts for the reported year to which regulation 59E or 59F applied retained at the end of the reported year;

(iv) CIL receipts from previous years to which regulation 59E or 59F applied retained at the end of the reported year

l

(i) £229,460.74

 

(ii) £3,037,909.10

 

(iii) £0

 

(iv) £0

 

4.23    The below table sets out the portion of CIL distributed to the relevant neighbourhood area within the monitoring year, with information on the associated infrastructure projects:

Town/Parish

Planning Reference

Amount received

Date sent

Spend or anticipated spend

Kirkbymoorside

20/01186/73M (payment 2 and 3 of 4)

£16,479.38 (£8,239.69 x2)

22.07.2022

The total parish payment to be received from this development once all four payments have been made will come to £32,958.75. The parish have agreed to spend the money on the following projects:

·         Trees for planters including tubs, planning compost.

·         Natural Flood Management Feasibility Assessment for Kirkbymoorside catchment.

·         Replacement of the existing 'Cantilever swing' and 'Junior swings' (which have been identified as needing replacement in 2022 by the annual play inspection report) at Old Road play area, with an 'Aero Tilt' and a 'Team Swing seat'.

·         New play equipment at Old Road play area.

Sinnington

19/00109/FUL (2 of 2)

£1,211.25

22.07.2022

The Parish is hoping to carry out some works to the Village Green towards providing car parking spaces for both residents and visitors to use.  The CIL money would contribute towards this.

Norton

18/01186/REM

 

18/01186/REM (2 of 2 Payments)

19/00905/REM

£3,053.25

 

£6,106.50

 

£1468.94

22.07.202

 

16.02.2023

16.02.2023

No response from the Town Council. The spending information will be published in the next Infrastructure Funding Statement.

Sherburn

21/00280/FUL

£258.53

16.02.2023

The parish have spent the CIL funding on a new defibrillator for the local playing fields association.

Rillington

21/01282/FUL

£756.00

16.02.2023

The CIL money is being used to assist in funding a War Memorial for Rillington. This project is “work in progress” and currently on hold pending receipt of permission from the landowner (NYC) for the proposed site. The design has been finalised and work will start once the owner’s permission has been obtained.

Flaxton

18/01136/FUL

£53.55

16.02.2023

The Council is intending to contribute the CIL money towards a project to restore a section of the path in Flaxton. It’s the section that runs between Oak Busk Lane and the level crossing. At the moment the path is very narrow and considered dangerous by villagers. The project will restore the path to its original width and therefore make it more useable and safer.

Swinton

21/00641/FUL & 22/00500/FUL

£3,995.85 & £1,173.00

16.02.2023

The funds are paying for a new roof on a Parish council shed, the work has not yet started.

Pickering

21/01261/FUL

£60.00

16.02.2023

It was agreed in August 2023 that £45,000 would be given to Pickering Recreation Ground Committee to enable them to repair the roof and cladding of their building. This was made up of this CIL money and other previously acquired CIL money.

 

 

£34,634.21

 

 

 

4.24    CIL expenditure

There has been no expenditure in relation to District Council held Levy. However, a total of £34,634.21 has been distributed to the associated Parish and Town Council’s through the 15% proportion per liable scheme, over the monitoring period 1 April 2022 to 31 March 2023.

5.0 CIL Spending

 

5.1      This is an interim Infrastructure Funding Statement. North Yorkshire Council is presently preparing and seeking approval on a CIL Spending Protocol which will be implemented in Spring/Summer 2024. This protocol will involve the development of an Infrastructure List (through the establishment of Officer and Member Working Groups) which will detail the current and future spending priorities for CIL and will have to be agreed by the Council Executive. Until this priority spend list is established Council CIL spending has been stalled. An updated IFS will be published in due course.

6.0   Former North Yorkshire County Council Reporting

 

6.1      Prior to Local Government reorganisation (LGR) the former North Yorkshire County Council (NYCC) also published a separate IFS. This was a used as a mechanism for presenting the infrastructure position for education and highways departments.

6.2      The former County Council was not in receipt of any CIL funds within the monitoring year 2022/23. In the case of Harrogate, Richmondshire, Hambleton and Scarborough S.106 commuted sums for Education and Highways have been directly collected and effectively bypass the Council. This means those figures are not included in the LPAs individual IFS figures but are recorded here in section 6.

6.3      The below table sets out the S.106 agreements entered into in the reporting year, together with information on the financial contribution and whether those funds have been received.

Date of S.106 Agreement

Planning Ref

Site

Contribution

Non-financial contribution

Purpose

Received

21-02-2022

20/02538/FUL

Easingwold CP

£352,527.76

 None

Education Facilities

£117,510.20

 07-02-2022

17/00628/OUT with all matters reserved (19/00757/AORM)

Colburn CP

£363,693.00

 None

Education Facilities

None

 27-10-2022

21/02763/FULMAJ

King James'

£111,611.50

 None

Education Facilities

None

 27-10-2022

21/02763/FULMAJ

Manse Farm/Meadowside Academy

£169,950.00

 None

Education Facilities

None

 06-12-2022

20/02318/OUTMAJ

Pannal CP

£752,826.50

 None

Education Facilities

None

 06-12-2022

 

20/02318/OUTMAJ

 

Rossett School

£536,352.83

 None

Education Facilities

None

 29-03-2023

21/00668/FULL

Melsonby

 £1,500

 None

Travel Plans

£1,500

 25-08-2022

 

21/02282/FUL

Leeming Bar

 £5,000

None

Travel Plan

 None

 27-10-2022

21/02763/FULMAJ

Knaresborough

£35,397.75

£5,000

 None

Highways Works

Travel Plan

 None

 18-01-2023

 

21/00728/FULMAJ

Marton-cum-Grafton

 £1,000

None

Travel Plan

£1,000

 06-12-2022

14/02970/FULMAJ
 20/02318/OUTMAJ

Harrogate

 £691,965.00

 

Plus £5,000

None

 Highways Works and Sustainable transport Infrastructure.

Plus £5,000 travel; plan

 None

 31-03-2023

22/04066/DVCMAJ

 Back lane / Dishforth Road

£10,000

None

Traffic Calming

 

 

6. 4     The below table sets out the funds received in the reporting year:

Planning Ref

School/area/Road named in S.106 agreement

Value of payment

Amount as per S.106/CIL agreement

Already received previously

The amount spent

The amount committed but not spent

The amount not committed or spent

19/03854/FULMAJ

Burton Leonard CE

 £           98,571.00

 £           98,571.00

 Nil

 Nil

 £           98,571.00

 Nil

16/01869/FULMAJ

Burton Leonard CE

 

£           95,172.00

 

£           95,172.00

 Nil

 Nil

£           95,172.00

 Nil

18/01532/FULMAJ

Green Hammerton CE

 

£           56,083.50

 

£

74,778.00

£           18,694.50

 Nil

£

74,778.00

 Nil

19/02262/OUTMAJ

Grove Road CP and/or Starbeck and/or other primary schools serving the catchment area

£           84,408.50

£       253,225.50

Nil

Nil

£           84,408.50

Nil

19/02262/OUTMAJ

Harrogate Grammar School, Harrogate High & Rossett

£           97,203.47

£       291,610.41

 Nil

Nil

£           97,203.47

Nil

20/01556/FULMAJ

Harrogate Grammar School, Harrogate High & Rossett

£           85,179.94

£       255,539.83

 Nil

Nil

£           85,179.94

Nil

20/01556/FULMAJ

HGS, HH & Rossett

£           85,179.94

£       255,539.83

 Nil

Nil

£           85,179.94

Nil

19/02262/OUTMAJ

HGS, HH & Rossett

£           97,203.47

£       291,610.41

 Nil

Nil

£           97,203.47

Nil

18/04687/FULMAJ

Holy Trinity I & J

£           72,194.76

£       302,511.00

 £         127,462.50

 Nil

£        199,657.26

Nil

16/00582/OUTMAJ

Killinghall CE

£         120,664.50

£       241,329.00

 Nil

Nil

£         120,664.50

 Nil

18/04749/FULMAJ

Killinghall CE

£       183,546.00

£       183,546.00

 Nil

Nil

£       183,546.00

Nil

15/04164/OUTMAJ - 17/03376/REMMAJ

Kirby Hill CE

£         492,855.00

£         492,855.00

 Nil

Nil

£         492,855.00

Nil

13/00535/EIAMAJ (17/05491/REMMAJ)

Manse Farm (New School)

£         200,240.00

£     2,002,400.00

£         200,240.00

 Nil

£        400,480.00

Nil

17/05595/OUTMAJ / 19/02342/REMMAJ

Pannal CP

£         147,290.00

£       441,870.00

£         147,290.00

 Nil

£        294,580.00

Nil

20/01556/FULMAJ

 

Primary education within Harrogate

 

£           78,830.00

 

£       236,490.00

 

Nil

Nil

£       236,490.00

 

Nil

18/04687/FULMAJ

 

Ripon Grammar School

 

£         111,572.36

 

£       169,049.02

 

Nil

Nil

£         111,572.36

 

Nil

17/05595/OUTMAJ

 

Rossett School and/or Harrogate Grammar School

 

£         114,317.23

 

£       342,951.70

 

£         114,317.23

 

Nil

£        228,634.46

 

Nil

19/01734/FULMAJ

 

Tockwith CE

 

£           72,512.00

 

£       217,536.00

 

£           72,512.00

 

Nil

£145,024.00

Nil

14/00779/OUT

 

Middleton Tyas CE

 

£         118,965.00

 

£         118,965.00

 

Nil

Nil

£         118,965.00

 

Nil

13/01314/MOUT

 

Kirkbymoorside CP

 

£         610,985.00

 

£         610,985.00

 

Nil

Nil

£         610,985.00

 

Nil

10/00899/MOUT or 11/01182/MREM

 

Malton CP

 

£         119,680.00

 

£       357,680.00

 

Nil

Nil

£         119,680.00

 

Nil

14/00427/MOUTE

 

Malton CP

 

£         241,512.00

 

£         241,512.00

 

Nil

Nil

Nill

 

Nil

14/00427/MOUTE

 

Malton CP

 

£         591,426.00

 

£ 591,426.00      

 

Nil

Nil

£         591,426.00

 

Nil

2015/0105/OUT 

 

Hambleton CE (Selby District)

 

£           46,906.20

 

£       156,354.00

 

£109,447.80

Nil

£       156,354.00

 

Nil

2015/0105/OUT

 

Selby High School

 

£           83,891.26

 

£       279,637.54

 

£195,746.28

Nil

£       279,637.54

 

Nil

2020/0776/FULM

Selby Abbey CE

£92,339.25

£92,339.25

Nill

Nill

£92,339.25

Nill

13/00535/EIAMAJ

Manse Farm

£5000

£5000

Nil

Nil

£5,000

Nil

13/02358/OUTMAJ

Panal

£25,000

£25,000

Nil

Nil

£25,000

Nil

13/02358/OUTMAJ

Panal

£189,500

£189,500

Nil

Nil

£189,500.00

Nil

14/03849/OUTMAJ

Penny Pot Lane

£35,000.00

£35,000.00

Nil

Nil

£35,000.00

Nil

14-03849/OUTMAJ

Orchard Close

£78,000.00

£78,000.00

Nil

Nil

£78,000.00

Nil

14/04315/FULMAJ

Riverside Sawmill

£5,000

£5,000

Nil

Nil

£5,000

Nil

18/04687/FUL

Bellman Walk

£2,250.00

£2,250.00

Nil

Nil

£2,250.00

Nil

18/04687/FUL

Bellman Walk

£8,000.00

£8,000.00

Nil

£8,000.00

Nil

Nil

17/01350/OUTMAJ

Boroughbridge Road

£5,000

£5,000

Nil

Nil

£5,000

Nil

17/01350/OUTMAJ

Boroughbridge Road

£8,000.00

£8,000.00

Nil

£8,000.00

Nil

Nil

17/01446/OUTMAJ

Green Hammerton

£25,000

£25,000

Nil

Nil

£25,000

Nil

17/01446/OUTMAJ

Green Hammerton

£5,000

£5,000

Nil

Nil

£5,000

Nil

17/02937/FULMAJ

Boroughbridge

£5,000

£5,000

Nil

£5,000

Nil

Nil

17/04102/OUTMAJ

Massey Fold

£8,000.00

£8,000.00

Nil

£8,000.00

Nil

Nil

19/02262/OUTMAJ

Kingsley Manor

£5,000

£5,000

Nil

£5,000

Nil

Nil

19/02262/OUTMAJ

Kingsley Manor

£3,000

£3,000

Nil

Nil

£3,000

Nil

17/04319/OUTMAJ

Chapel Hill

£5,000

£5,000

Nil

£5,000

Nil

Nil

20/01556/FULMAJ

Granby Meadows

£10,000

£10,000

Nil

Nil

£10,000

Nil

2019/0325/FULM

Church Fenton

£80,000

£80,000

Nil

£80,000

Nil

Nil